Filter by Topic
Filter by Type
attachment
DACC IRP Volume #21 - Coiled Tubing Operations
Resource DACC-IRP-Volumes DACC-IRP-Volume-21-Coiled-Tubing-Operations
Coiled Tubing Operations Industry Recommended Practice (IRP) ensures guidelines for coiled tubing are in place and readily available for all personnel involved in the development, planning, and completion of coiled tubing operations.
attachment
DACC IRP Volume #13 - Wireline Operations
Resource DACC-IRP-Volumes DACC-IRP-VOLUME-13-WIRELINE-OPERATIONS
IRP 13 (formerly Slickline Operations) focuses on equipment, practices and maintenance to ensure safe operation of wireline related equipment.
attachment
DACC IRP Volume #24 - Fracture Stimulation (Sanctioned)
Resource DACC-IRP-Volumes DACC-IRP-VOLUME-24-FRACTURE-STIMULATION-(SANCTIONE
Fracture Stimulation Industry Recommended Practice (IRP) adopts a risk-based approach to develop a process for reviewing, assessing, and developing controls to minimize risk during fracture stimulation operations.
attachment
DACC IRP Volume #05 - Minimum Wellhead Requirements
Resource DACC-IRP-Volumes DACC-IRP-VOLUME-05-MINIMUM-WELLHEAD-REQUIREMENTS
Minimum Wellhead Requirements Industry Recommended Practice provides an introduction to wellhead components and major variations in wellhead design driven by reservoir and well operating considerations and conditions.