Resource Search Resource Search

Dropped Electrical Phase | Issue 03-2025


While completing annual preventative maintenance on a de-energized vertically mounted overhead isolation switch, an Electrician attempted to close the switch when one phase broke free and fell approximately 14ft. The load side of the switch was connected by cabling, resulting in the broken phase swinging into a nearby switchgear cabinet.