A fracturing (“frac”)/ wellhead assembly was lifted approximately half an inch to
adjust a support (levelling jack) stand. The lift was conducted using the horizontally -
attached shouldered eyebolts on the equipment. The orientation of the eyebolts
required an angular lift. The lift took place and the eyebolt shanks sheared off. The
wellhead equipment was secured and no other damage occurred.