DACC IRP Volume #03 - In Situ Heavy Oil Operations
November 30, 2012
The document is comprised of six chapters broadly representative of the chronology, or life cycle, of an in situ heavy oil operation. Each chapter is targeted toward a particular audience and moderately accessible to the in situ heavy oil generalist. Each chapter has been produced with its own title page and table of contents to facilitate printing only the relevant sections for the interested user.
A "Doghouse Package" consisting of appendices related to wellsite spacing requirements have been produced as stand alone pdf documents in both 8.5x11 and 11x17 format.
- Minimum Wellsite Spacing Requirements (IRP 3, Appendix A, I, J, K) (8.5 x 11 pdf)
- Minimum Wellsite Spacing Requirements (IRP 3, Appendix A, I, J, K) (11 x 17 pdf)
Developer: DACC
Sponsor Organization: CAPP
Current Status: Sanctioned November 2013
Feedback:
Comments or suggestion can be submitted via e-mail (safety@energysafetycanada.com).